Created attachment 1090064 [details] Timelines Description of problem: When accessing the Timelines the power activity event is missing an icon. Version-Release number of selected component (if applicable): 5.5.0.9-beta2.20151102161742_5530c9a How reproducible: 100% Steps to Reproduce: 1. Add an OpenStack Platform Director provider 2. Enable notifications 3. Scale out the OpenStack Platform Director provider with an additional node 4. Check the Timelines, Power Activity events for the OpenStack Platform Director provider Actual results: The compute.instance.create.end doesn't have an icon. Expected results: The compute.instance.create.end has an icon. Additional info: Attaching screenshot.
Verified in 5.5.0.11.
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. https://access.redhat.com/errata/RHSA-2015:2551