Bug 164686 - Show Job Duration
Summary: Show Job Duration
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: Fedora Infrastructure
Classification: Retired
Component: extras buildsys
Version: unspecified
Hardware: All
OS: Linux
medium
low
Target Milestone: ---
Assignee: Seth Vidal
QA Contact: Jeremy Katz
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2005-07-30 09:28 UTC by Warren Togami
Modified: 2007-04-18 17:30 UTC (History)
1 user (show)

Fixed In Version: plague-0.3
Clone Of:
Environment:
Last Closed: 2005-08-19 19:05:54 UTC
Embargoed:


Attachments (Terms of Use)

Description Warren Togami 2005-07-30 09:28:00 UTC
http://buildsys.fedoraproject.org/build-status/
It would be nice if the job listings said when the job began.  Maybe something
like "6 minutes ago" or "2 hours ago".  This way you can easily see at a glance
more status information, and more immediately recognize the difference between
the buildsystem getting stuck or a package build just taking a very long time. 

http://buildsys.fedoraproject.org/build-status/job.psp?uid=215
Same thing when viewing a specific job, except perhaps more detail about when it
started displaying a date/time.

(Successful build details already shows total duration, which is good.)

Comment 1 Dan Williams 2005-08-19 19:05:54 UTC
This should be fixed now, a "Started" is shown on the job detail page.  plague
0.3x and later should have it


Note You need to log in before you can comment on or make changes to this bug.