Red Hat Satellite engineering is moving the tracking of its product development work on Satellite to Red Hat Jira (issues.redhat.com). If you're a Red Hat customer, please continue to file support cases via the Red Hat customer portal. If you're not, please head to the "Satellite project" in Red Hat Jira and file new tickets here. Individual Bugzilla bugs will be migrated starting at the end of May. If you cannot log in to RH Jira, please consult article #7032570. That failing, please send an e-mail to the RH Jira admins at rh-issues@redhat.com to troubleshoot your issue as a user management inquiry. The email creates a ServiceNow ticket with Red Hat. Individual Bugzilla bugs that are migrated will be moved to status "CLOSED", resolution "MIGRATED", and set with "MigratedToJIRA" in "Keywords". The link to the successor Jira issue will be found under "Links", have a little "two-footprint" icon next to it, and direct you to the "Satellite project" in Red Hat Jira (issue links are of type "https://issues.redhat.com/browse/SAT-XXXX", where "X" is a digit). This same link will be available in a blue banner at the top of the page informing you that that bug has been migrated.
Bug 1694821 - Save sync plan after new rec logic is added
Summary: Save sync plan after new rec logic is added
Keywords:
Status: CLOSED DUPLICATE of bug 1694822
Alias: None
Product: Red Hat Satellite
Classification: Red Hat
Component: Sync Plans
Version: 6.5.0
Hardware: Unspecified
OS: Unspecified
unspecified
medium
Target Milestone: Released
Assignee: satellite6-bugs
QA Contact: Stephen Wadeley
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2019-04-01 19:04 UTC by Samir Jha
Modified: 2019-10-07 17:20 UTC (History)
0 users

Fixed In Version:
Doc Type: If docs needed, set a value
Doc Text:
Clone Of:
Environment:
Last Closed: 2019-04-02 18:58:06 UTC
Target Upstream Version:
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Foreman Issue Tracker 26503 0 Urgent Closed Save sync plan after new rec logic is added 2020-08-26 21:16:02 UTC

Description Samir Jha 2019-04-01 19:04:11 UTC
We removed the saving of sync plan after changes to recurring logic as part of https://github.com/Katello/katello/pull/8004/commits/23e09c546d04f54479f683dc7995bea1d81ae430#diff-cbbf4a31420b097c086fac10249ad959L64

We should change that back as there are cases where the update recurring logic is not getting tied back to sync plan downstream.

Comment 1 Samir Jha 2019-04-01 19:04:13 UTC
Created from redmine issue http://projects.theforeman.org/issues/26503

Comment 4 Brad Buckingham 2019-04-02 18:58:06 UTC

*** This bug has been marked as a duplicate of bug 1694822 ***


Note You need to log in before you can comment on or make changes to this bug.