Bug 1710465 - [RFE] migrate from single stack to multi-stack/split-controlplane
Summary: [RFE] migrate from single stack to multi-stack/split-controlplane
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: Red Hat OpenStack
Classification: Red Hat
Component: openstack-tripleo
Version: 16.0 (Train)
Hardware: Unspecified
OS: Unspecified
medium
medium
Target Milestone: ---
: ---
Assignee: James Slagle
QA Contact: Marian Krcmarik
URL:
Whiteboard: docs-accepted
Depends On:
Blocks: 1789430
TreeView+ depends on / blocked
 
Reported: 2019-05-15 15:04 UTC by James Slagle
Modified: 2022-08-11 16:22 UTC (History)
13 users (show)

Fixed In Version:
Doc Type: Release Note
Doc Text:
When you upgrade from Red Hat OpenStack Platform (RHOSP) 13 DCN to RHOSP 16.1 DCN, it is not possible to migrate from the single stack RHOSP 13 deployment into a multi-stack RHOSP 16.1 deployment. The RHOSP 13 stack continues to be managed as a single stack in the Orchestration service (heat) even after you upgrade to RHOSP 16.1. + After you upgrade to RHOSP 16.1, you can deploy new DCN sites as new stacks. For more information, see the multi-stack documentation for RHOSP 16.1 DCN.
Clone Of:
Environment:
Last Closed: 2021-08-02 14:46:16 UTC
Target Upstream Version:
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Red Hat Issue Tracker OSP-5639 0 None None None 2022-08-11 16:22:40 UTC

Description James Slagle 2019-05-15 15:04:01 UTC
Need to document how we plan to support upgrades from 13 single stack to 16 multi-stack.

We plan to support deploying additional stacks to connect to the single stack from an upgraded 13->16 deployment.

We don't support a way to breakup the upgraded single stack, other than parallel migration to new hardware (scale down single stack, deploy additional new stack for the site).


Note You need to log in before you can comment on or make changes to this bug.