Note: This bug is displayed in read-only format because
the product is no longer active in Red Hat Bugzilla.
Red Hat Satellite engineering is moving the tracking of its product development work on Satellite to Red Hat Jira (issues.redhat.com). If you're a Red Hat customer, please continue to file support cases via the Red Hat customer portal. If you're not, please head to the "Satellite project" in Red Hat Jira and file new tickets here. Individual Bugzilla bugs will be migrated starting at the end of May. If you cannot log in to RH Jira, please consult article #7032570. That failing, please send an e-mail to the RH Jira admins at rh-issues@redhat.com to troubleshoot your issue as a user management inquiry. The email creates a ServiceNow ticket with Red Hat. Individual Bugzilla bugs that are migrated will be moved to status "CLOSED", resolution "MIGRATED", and set with "MigratedToJIRA" in "Keywords". The link to the successor Jira issue will be found under "Links", have a little "two-footprint" icon next to it, and direct you to the "Satellite project" in Red Hat Jira (issue links are of type "https://issues.redhat.com/browse/SAT-XXXX", where "X" is a digit). This same link will be available in a blue banner at the top of the page informing you that that bug has been migrated.
Created attachment 1635362[details]
6.7 screenshot
Description of problem:
In web UI in job details there isn't overall result inside pie chart. There is only percentage and result (Failed, Succeeded) is missing. Result was there in 6.6 ( see attachments )
Version-Release number of selected component (if applicable):
Sat 6.7 snap 1
How reproducible:
always
Steps to Reproduce:
1. Have some job that already run
2. Navigate to the details page of job
Actual results:
There is only percentage inside of pie chart
Expected results:
There should be overall result below percentage
Additional info:
Looks like this element where result should be (and in 6.6 was) is still there but is empty
Since the problem described in this bug report should be
resolved in a recent advisory, it has been closed with a
resolution of ERRATA.
For information on the advisory, and where to find the updated
files, follow the link below.
If the solution does not work for you, open a new bug report.
https://access.redhat.com/errata/RHSA-2020:1454
Created attachment 1635362 [details] 6.7 screenshot Description of problem: In web UI in job details there isn't overall result inside pie chart. There is only percentage and result (Failed, Succeeded) is missing. Result was there in 6.6 ( see attachments ) Version-Release number of selected component (if applicable): Sat 6.7 snap 1 How reproducible: always Steps to Reproduce: 1. Have some job that already run 2. Navigate to the details page of job Actual results: There is only percentage inside of pie chart Expected results: There should be overall result below percentage Additional info: Looks like this element where result should be (and in 6.6 was) is still there but is empty