Note: This bug is displayed in read-only format because
the product is no longer active in Red Hat Bugzilla.
Red Hat Satellite engineering is moving the tracking of its product development work on Satellite to Red Hat Jira (issues.redhat.com). If you're a Red Hat customer, please continue to file support cases via the Red Hat customer portal. If you're not, please head to the "Satellite project" in Red Hat Jira and file new tickets here. Individual Bugzilla bugs will be migrated starting at the end of May. If you cannot log in to RH Jira, please consult article #7032570. That failing, please send an e-mail to the RH Jira admins at rh-issues@redhat.com to troubleshoot your issue as a user management inquiry. The email creates a ServiceNow ticket with Red Hat. Individual Bugzilla bugs that are migrated will be moved to status "CLOSED", resolution "MIGRATED", and set with "MigratedToJIRA" in "Keywords". The link to the successor Jira issue will be found under "Links", have a little "two-footprint" icon next to it, and direct you to the "Satellite project" in Red Hat Jira (issue links are of type "https://issues.redhat.com/browse/SAT-XXXX", where "X" is a digit). This same link will be available in a blue banner at the top of the page informing you that that bug has been migrated.
Concurrent syncing of multiple composite content views to the capsule servers is stuck(locked) and failed with error "required lock is already taken by another task".
DescriptionGourav Padholia
2020-05-18 15:50:50 UTC
Description of problem:
Concurrent syncing of multiple composite content views to the capsule servers is failed with the error "A required lock is already taken by another task".
Version-Release number of selected component (if applicable):
6.7
How reproducible:
100 %
Steps to Reproduce:
1. Create two composite content views on Satellite web UI. Keep one or two content view same in both the composite content views.
2. Promote the CCVs to the capsules environment. This will trigger separate Capsule sync for each of these CCVs for the capsule server.
3. Syncing a single CCVs to the capsules server starts in parallel and locks some resources and syncing any other CCVs to the same capsules will fail.
Actual results:
Capsule sync failed with error "A required lock is already taken by another task".
Expected results:
The capsule should be sync without error.
Additional info: