Description of problem: When users run pipeline with finally task, status looks improper, It says some tasks got cancelled but actually none was. Prerequisites (if any, like setup, operators/versions): OCP 4.7, pipelines 1.3 (p->0.19.0, t->0.10.2) Steps to Reproduce oc create -f https://raw.githubusercontent.com/tektoncd/pipeline/v0.19.0/examples/v1beta1/pipelineruns/pipelinerun-with-final-tasks.yaml Actual results Task status popover shows some tasks as cancelled. Expected results No tasks got cancelled, and should show correctly as such. Reproducibility (Always/Intermittent/Only Once): Always Additional info: Providing slack discussion to know more about this bug: https://coreos.slack.com/archives/CG5GV6CJD/p1612537936146300
Verified on 4.8.0-0.nightly-2021-02-21-102854
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory (Moderate: OpenShift Container Platform 4.8.2 bug fix and security update), and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. https://access.redhat.com/errata/RHSA-2021:2438