Description of problem: [Workload DFG][RGW MS Active-Active] Slow sync in both direction Version-Release number of selected component (if applicable): RHCS 5.3 16.2.10-58.el8cp How reproducible: Always
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory (Red Hat Ceph Storage 7.0 Bug Fix update), and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. https://access.redhat.com/errata/RHBA-2023:7780