Bug 2207925 - [RDR] When performing cross cluster failover of 2 apps cleanup of app-1 is stuck and failover of app-2 is stuck [NEEDINFO]
Summary: [RDR] When performing cross cluster failover of 2 apps cleanup of app-1 is st...
Keywords:
Status: ASSIGNED
Alias: None
Product: Red Hat OpenShift Data Foundation
Classification: Red Hat Storage
Component: odf-dr
Version: 4.13
Hardware: Unspecified
OS: Unspecified
unspecified
high
Target Milestone: ---
: ODF 4.14.0
Assignee: Shyamsundar
QA Contact: krishnaram Karthick
URL:
Whiteboard:
Depends On: 2219437
Blocks: 2154341
TreeView+ depends on / blocked
 
Reported: 2023-05-17 10:25 UTC by Pratik Surve
Modified: 2023-08-09 17:00 UTC (History)
6 users (show)

Fixed In Version:
Doc Type: Known Issue
Doc Text:
Clone Of:
Environment:
Last Closed:
Embargoed:
muagarwa: needinfo? (srangana)


Attachments (Terms of Use)

Description Pratik Surve 2023-05-17 10:25:53 UTC
Description of problem (please be detailed as possible and provide log
snippests):
[RDR] When performing cross cluster failover of 2 apps cleanup of app-1 is stuck and failover of app-2 is stuck


Version of all relevant components (if applicable):

OCP version:- 4.13.0-0.nightly-2023-05-11-225357
ODF version:- 4.13.0-199
CEPH version:- ceph version 17.2.6-47.el9cp (6add4f24d1eff88e1db808ecdc16fd5b2db96dd4) quincy (stable)
ACM version:- 2.8.0-169
SUBMARINER version:- v0.15.0
VOLSYNC version:- volsync-product.v0.7.1

Does this issue impact your ability to continue to work with the product
(please explain in detail what is the user impact)?
yes

Is there any workaround available to the best of your knowledge?


Rate from 1 - 5 the complexity of the scenario you performed that caused this
bug (1 - very simple, 5 - very complex)?


Can this issue reproducible?


Can this issue reproduce from the UI?


If this is a regression, please provide more details to justify this:


Steps to Reproduce:
1.Deploy RDR cluster 
2.Deploy app-1 over c1 and deploy app-2 over c2
3. Perform failover of both the apps ie app-1 -> c2 and app-2 ->c1


Actual results:
PVC are stuck in termination state 

oc get drpc -A -o wide           
NAMESPACE          NAME                              AGE    PREFERREDCLUSTER   FAILOVERCLUSTER   DESIREDSTATE   CURRENTSTATE   PROGRESSION                 START TIME             DURATION          PEER READY
openshift-gitops   busybox-1-placement-drpc          46h    prsurve-c1         prsurve-vm-d      Failover       FailedOver     Cleaning Up                 2023-05-16T12:44:10Z                     True
openshift-gitops   busybox-2-kernel-placement-drpc   2d1h   prsurve-c1                           Relocate       Relocated      Completed                   2023-05-16T10:32:57Z   10m19.27439987s   True
openshift-gitops   busybox-8-placement-drpc          2d2h   prsurve-c1         prsurve-c1        Failover       FailingOver    WaitingForResourceRestore   2023-05-16T12:44:04Z                     False




Expected results:


Additional info:

Comment 9 Mudit Agarwal 2023-06-05 11:36:46 UTC
Not a 4.13 blocker, adding it as a known issue.
@srangana please fill the doc text.


Note You need to log in before you can comment on or make changes to this bug.