Description of problem: Deployment Guide for el 5.2 shows "January 2008" as a build date instead of current. https://engineering.redhat.com/docbot/gu-IN/Red_Hat_Enterprise_Linux/5.2/html/Deployment_Guide/ Version-Release number of selected component (if applicable): 5.2 How reproducible: everytime Steps to Reproduce: 1. Build HTMLs through docbot 2. Visit HTML urls 3. Actual results: January 2008 is shown as a build date Expected results: "Current_Month" 2008 should be shown as a build date Additional info:
updated in svn to July 2008