Bug 629155 - Scheduler stubbornly picking busy LC
Summary: Scheduler stubbornly picking busy LC
Keywords:
Status: CLOSED WONTFIX
Alias: None
Product: Beaker
Classification: Retired
Component: scheduler
Version: 0.5
Hardware: All
OS: Linux
low
medium
Target Milestone: ---
Assignee: beaker-dev-list
QA Contact:
URL:
Whiteboard: Scheduler
Depends On: 1127129
Blocks:
TreeView+ depends on / blocked
 
Reported: 2010-09-01 05:10 UTC by Marian Csontos
Modified: 2020-10-21 14:19 UTC (History)
3 users (show)

Fixed In Version:
Doc Type: Bug Fix
Doc Text:
Clone Of:
Environment:
Last Closed: 2020-10-21 14:15:38 UTC
Embargoed:


Attachments (Terms of Use)

Description Marian Csontos 2010-09-01 05:10:47 UTC
Description of problem:

While I tried to run a job J:1387 [1] on beaker-stage, the most recent RHEL6 distro [2] was available on lab-devel only and all RHEL6 capable x86_64 machines on given LC were in use by J:1385. [3]

Though there are other suitable RHEL6 distros available on lab-stage, scheduler always picked lab-devel (J:1388)

After manually excluding busy LC I was able to run a job [4]

[1] https://beaker-stage.app.eng.bos.redhat.com/jobs/1387
[2] https://beaker-stage.app.eng.bos.redhat.com/distros/view?id=14082
[3] https://beaker-stage.app.eng.bos.redhat.com/jobs/1385
[4] https://beaker-stage.app.eng.bos.redhat.com/jobs/1389

Version-Release number of selected component (if applicable):
0.5.53?

How reproducible:
100%

Steps to Reproduce:
1. 
2.
3.
  
Actual results:
Scheduler picking busy LC

Expected results:
Scheduler picks the idle LC

Additional info:

Comment 1 Nick Coghlan 2012-10-17 04:38:18 UTC
Bulk reassignment of issues as Bill has moved to another team.

Comment 3 Nick Coghlan 2014-08-08 01:47:12 UTC
This is on hold until we evaluate the possibility of switching to a more capable scheduling engine.


Note You need to log in before you can comment on or make changes to this bug.