Note: This bug is displayed in read-only format because
the product is no longer active in Red Hat Bugzilla.
RHEL Engineering is moving the tracking of its product development work on RHEL 6 through RHEL 9 to Red Hat Jira (issues.redhat.com). If you're a Red Hat customer, please continue to file support cases via the Red Hat customer portal. If you're not, please head to the "RHEL project" in Red Hat Jira and file new tickets here. Individual Bugzilla bugs in the statuses "NEW", "ASSIGNED", and "POST" are being migrated throughout September 2023. Bugs of Red Hat partners with an assigned Engineering Partner Manager (EPM) are migrated in late September as per pre-agreed dates. Bugs against components "kernel", "kernel-rt", and "kpatch" are only migrated if still in "NEW" or "ASSIGNED". If you cannot log in to RH Jira, please consult article #7032570. That failing, please send an e-mail to the RH Jira admins at rh-issues@redhat.com to troubleshoot your issue as a user management inquiry. The email creates a ServiceNow ticket with Red Hat. Individual Bugzilla bugs that are migrated will be moved to status "CLOSED", resolution "MIGRATED", and set with "MigratedToJIRA" in "Keywords". The link to the successor Jira issue will be found under "Links", have a little "two-footprint" icon next to it, and direct you to the "RHEL project" in Red Hat Jira (issue links are of type "https://issues.redhat.com/browse/RHEL-XXXX", where "X" is a digit). This same link will be available in a blue banner at the top of the page informing you that that bug has been migrated.
Created attachment 472115[details]
Available Subscriptions vs Total Contracts
Description of problem:
See the attached screenshot
The Contract Selection dialog is reporting the "Available Subscriptions" as the "Total Contracts"
In the screenshot example:
- there are a total of 2 Contracts, not 15
- there is a total quantity of 15 available subscriptions
I suggest changing the "Total Contracts" label to "Total Available Subscriptions" (or just "Total Available" to be interpreted by the user :-)
Version-Release number of selected component (if applicable):
[root@jsefler-onprem02 ~]# rpm -q subscription-manager-gnome
subscription-manager-gnome-0.93.9-1.git.15.3545a2a.el6.x86_64
How reproducible:
Steps to Reproduce:
1.
2.
3.
Actual results:
Expected results:
Additional info:
VERSION...
[root@jsefler-onprem01 ~]# rpm -q subscription-manager-gnome
subscription-manager-gnome-0.93.9-1.git.17.9bab7c0.el6.x86_64
The value of the "Total Contracts" has been corrected.
See the next attached screenshot
moving to VERIFIED
An advisory has been issued which should help the problem
described in this bug report. This report is therefore being
closed with a resolution of ERRATA. For more information
on therefore solution and/or where to find the updated files,
please follow the link below. You may reopen this bug report
if the solution does not work for you.
http://rhn.redhat.com/errata/RHEA-2011-0611.html
Created attachment 472115 [details] Available Subscriptions vs Total Contracts Description of problem: See the attached screenshot The Contract Selection dialog is reporting the "Available Subscriptions" as the "Total Contracts" In the screenshot example: - there are a total of 2 Contracts, not 15 - there is a total quantity of 15 available subscriptions I suggest changing the "Total Contracts" label to "Total Available Subscriptions" (or just "Total Available" to be interpreted by the user :-) Version-Release number of selected component (if applicable): [root@jsefler-onprem02 ~]# rpm -q subscription-manager-gnome subscription-manager-gnome-0.93.9-1.git.15.3545a2a.el6.x86_64 How reproducible: Steps to Reproduce: 1. 2. 3. Actual results: Expected results: Additional info: