Hide Forgot
Help Desk Ticket Reference: https://enterprise.redhat.com/issue-tracker/?module=issues&action=view&tid=766063&gid=1354 project_key: SOA Customer Request for inclusion of Backport JBAS-5880 included in EAP 4.3.0_CP09 into SOA-P 4.3.0
Link: Added: This issue depends JBPAPP-1119
Link: Added: This issue incorporates JBAS-5880
This will be resolved when we pick up EAP 4.3 CP09.
According to JBPAPP-1119 QE verified this issue was included from EAP 4.3 CP09 CR1. EAP 4.3 CP09
Release Notes Docs Status: Added: Not Yet Documented Writer: Added: dlesage
Release Notes Docs Status: Removed: Not Yet Documented Added: Documented as Resolved Issue Release Notes Text: Added: https://issues.jboss.org/browse/JBAS-5880 JBoss experienced a synchronization problem when it was started under load. This was because, in the TxServerClientInterceptor class' getEmptyPropagationContext method, a static member was initialized without being synchronized. Therefore, a second thread could see the member as being non-null while the first thread was still initialising its data. To fix this issue, a "temp" propagation context, that is only assigned to the member once it is fully initialised, has been constructed. As a result, these synchronisation issues no longer occur.
Verified in ER2