Hide Forgot
Affects: Documentation (Ref Guide, User Guide, etc.) Complexity: Low Date of First Response: 2010-05-12 09:52:21 project_key: JBEPP Tracker for JIRAs and other product issues to be included in the 5.0 Release Notes. Resolved JIRAs for 5.0GA release: https://jira.jboss.org/jira/secure/ReleaseNote.jspa?version=12314079&styleName=Text&projectId=12310745&Create=Create
Current build of Enterprise Portal Platform 5.0 (closed Beta) Release Notes can be viewed/downloaded from: http://downtown.englab.bne.redhat.com/drafts/JBoss_Enterprise_Portal_Platform/5.0_Beta/Enterprise_Portal_Platform_Reference_Guide/ SVN: http://svn.jboss.org/repos/gatein/portal/branches/EPP_5_0_0_Branch_Docs/Enterprise_Portal_Platform_Release_Notes
The Release Notes document is scheduled to be updated between Wednesday 28th April and Friday 30th April. All issues to be included should be recorded here before Thursday 29th April
A rough draft of this document has been committed to svn. The svn location is: http://svn.jboss.org/repos/gatein/portal/branches/EPP_5_0_0_Branch_Docs/Enterprise_Portal_Platform_Release_Notes A current build of this document is available at: http://downtown.englab.bne.redhat.com/drafts/JBoss_Enterprise_Portal_Platform/5.0_Beta/Enterprise_Portal_Platform_Release_Notes/ Multiple sections of this document required content input.