This site requires JavaScript to be enabled to function correctly, please enable it.
Note: This bug is displayed in read-only format because
the product is no longer active in Red Hat Bugzilla.
Summary:
[rhevm-upgrade] [RFE] perform full roll-back when upgrade is failing
Product:
Red Hat Enterprise Virtualization Manager
Reporter:
Haim <hateya>
Component:
RFEs Assignee:
Sandro Bonazzola <sbonazzo>
Status:
CLOSED
CURRENTRELEASE
QA Contact:
Leonid Natapov <lnatapov>
Severity:
high
Docs Contact:
Priority:
unspecified
Version:
3.2.0 CC:
abaron, acathrow, alourie, dyasny, hateya, iheim, lpeer, mgoldboi, sgrinber, yeylon
Target Milestone:
--- Keywords:
FutureFeature
Target Release:
3.2.0
Hardware:
x86_64
OS:
Linux
Whiteboard:
integration
Fixed In Version:
sf16
Doc Type:
Enhancement
Doc Text:
Story Points:
---
Clone Of:
Environment:
Last Closed:
Type:
Bug
Regression:
---
Mount Type:
---
Documentation:
---
CRM:
Verified Versions:
Category:
---
oVirt Team:
---
RHEL 7.3 requirements from Atomic Host:
Cloudforms Team:
---
Target Upstream Version:
Embargoed:
Bug Depends On:
Bug Blocks:
915537 , 948448