Bug 888116
| Summary: | [rhev-reports]RHEV-M reports portal does not work properly. | ||||||
|---|---|---|---|---|---|---|---|
| Product: | Red Hat Enterprise Virtualization Manager | Reporter: | Keigo Noha <knoha> | ||||
| Component: | ovirt-engine-reports | Assignee: | Yaniv Lavi <ylavi> | ||||
| Status: | CLOSED INSUFFICIENT_DATA | QA Contact: | David Botzer <dbotzer> | ||||
| Severity: | medium | Docs Contact: | |||||
| Priority: | unspecified | ||||||
| Version: | 3.1.0 | CC: | bazulay, dyasny, iheim, pstehlik, Rhev-m-bugs, sgrinber, ykaul | ||||
| Target Milestone: | --- | ||||||
| Target Release: | --- | ||||||
| Hardware: | x86_64 | ||||||
| OS: | Linux | ||||||
| Whiteboard: | infra | ||||||
| Fixed In Version: | Doc Type: | Bug Fix | |||||
| Doc Text: | Story Points: | --- | |||||
| Clone Of: | Environment: | ||||||
| Last Closed: | 2013-01-21 09:10:15 UTC | Type: | Bug | ||||
| Regression: | --- | Mount Type: | --- | ||||
| Documentation: | --- | CRM: | |||||
| Verified Versions: | Category: | --- | |||||
| oVirt Team: | Infra | RHEL 7.3 requirements from Atomic Host: | |||||
| Cloudforms Team: | --- | Target Upstream Version: | |||||
| Embargoed: | |||||||
| Attachments: |
|
||||||
|
Description
Keigo Noha
2012-12-18 02:26:18 UTC
Created attachment 665368 [details]
incorrect headline
Should we open two seperate BZs ? 1. Modified date is prior to Created date incorrect or missing Year 2. Change language from English to Japanese, Headlines in graphs does not show correctly. Also the description should be edited: [rhev-reports]RHEV-M reports portal does not work properly --> [rhev-reports]reports modified date is missing the year Are there any Japanese fonts installed on the RHEVM server? The titles are shows as blank probably because of this. Why do they need the year in the dates? (The reason the create date and modify date are different are because create date is the date the report was installed to the portal and modified date is the date the report was last touched by our development) Yaniv the modified date is prior to the create date which should the other way around... (In reply to comment #5) > the modified date is prior to the create date > which should the other way around... not sure i agree. create - when the report was creared in the current system modified date - when the report definition was last changed. these are semantics which vary between systems. I'm assuming these are the ones jasper use, and i can live with them. the other issue stand of course. Keigo, Just to be clear about the customer issue 1 - This BZ was opened when logged-in in English ? 2 - what was the customer main isse ? chronologic order of dates (creation vs change) ? 3 - please clarify "they change the login language from English to Japanese, graphs on Report does not show correctly" - more details will be useful. No reply since December closing on insufficient data. Yaniv |