Description of problem: Version-Release number of selected component (if applicable): EAP 6.0.GA RHQ 4.7.0-master Build Number: 72e3f11 How reproducible: always Steps to Reproduce: 1. have EAP 6.0.GA standalone imported 2. create a new 'Async Handler' within logging subsystem 3. update it's configuration Actual results: update fails: {JBAS014653: Composite operation failed and was rolled back. Steps that failed:={Operation step-2=JBAS014746: level may not be null}}, rolled-back=true Expected results: Additional info: