Description of problem: Moving a big tree of nodes can take a significant time to complete on eXo JCR 1.15.3 and earlier versions. Version 1.15.4.GA contains the fixes for https://jira.exoplatform.org/browse/JCR-2125, which result in performance improvements for move and rename operations.
There are two new configuration parameters which control the behavior of events triggering at move and rename operations, as described in JIRA: https://jira.exoplatform.org/browse/JCR-2125?focusedCommentId=248811&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-248811 The default setting is optimized, so there is no need to add any of the two to the base JCR configuration in JPP 6.
Target milestone is ER03 so I'm changing status to modified
Verified in ER03. There is eXo JCR 1.15.4-GA-redhat-1 in ER03.
This product has been discontinued or is no longer tracked in Red Hat Bugzilla.