Description of problem: Message "**systems.details.virt.actions.scheduled**" is displayed instead of some resonable text like e.g "Actions for virtual machines were successfully scheduled" Version-Release number of selected component (if applicable): Satellite-5.6.0-RHEL6-re20130607.1 How reproducible: always Steps to Reproduce: 0. have a VirtHost regged to Satellite and hosting at least 2 VMs (guests) 1. @webui: navigate to Systems - <chosen VHost> - Virtualization tab - Details subtab 2. select at least two guests and Apply any action or Apply any changes (e.g. Restart systems) 3. confirmation pops up, click Confirm, et voila the message can be seen Actual results: displayed message contains placeholder "**systems.details.virt.actions.scheduled**" Expected results: displayed message contains reasonable text Additional info:
this issue is fixed in spacewalk.git by commit 13a5b7383b9c45865f917870ae33af4dc815cdce
Satellite 5.6 has been released. This bug was tracked under the release. This bug was either VERIFIED or RELEASE_PENDING (re-verified prior shortly before release). Moving to CLOSED CURRENT_RELEASE. Text from Upgrade Erratum follows: Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. http://rhn.redhat.com/errata/RHEA-2013-1395.html