Bug 1012247

Summary: Information about the "Process" block is incorrect.
Product: [Community] PressGang CCMS Reporter: Lee Newson <lnewson>
Component: DocumentationAssignee: pressgang-ccms-dev
Status: CLOSED DUPLICATE QA Contact:
Severity: unspecified Docs Contact:
Priority: unspecified    
Version: 2.0   
Target Milestone: ---   
Target Release: ---   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Build Name: 13968, PressGang CCMS Handbook-2.0-1 Build Date: 26-09-2013 15:21:44 Topic ID: 23131-540797 [Latest]
Last Closed: 2013-10-09 05:55:42 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Lee Newson 2013-09-26 05:28:01 UTC
Title: Use the <literal>Process:</literal> Block to Group Tasks in a Sequence

The information about processes is partly incorrect and missing some information. Details:

1. A Process can be used as either a Section, or a Chapter.

2. "Each topic's output will include a link to the previous topic in the process at the top, and a link to the next topic in the process at the bottom" is wrong. It will only included next/previous links to "Task" topics. So if I had the following:

Concept 1
Task 1
Concept 2
Task 2

Concept 2 wouldn't have any previous/next links as a process block is designed to automatically link the steps (identified as task topics) together.

3. No mention is made about the topics having to be a task to have the links injected.

Comment 1 Lee Newson 2013-10-09 05:55:42 UTC

*** This bug has been marked as a duplicate of bug 1012226 ***