Bug 1079287
Summary: | Tasks are cleared while they are still running | ||
---|---|---|---|
Product: | Red Hat Enterprise Virtualization Manager | Reporter: | Pablo Iranzo Gómez <pablo.iranzo> |
Component: | ovirt-engine | Assignee: | Liran Zelkha <lzelkha> |
Status: | CLOSED ERRATA | QA Contact: | movciari |
Severity: | medium | Docs Contact: | |
Priority: | medium | ||
Version: | 3.3.0 | CC: | aberezin, acathrow, adahms, bazulay, eedri, emesika, iheim, lpeer, oourfali, pstehlik, Rhev-m-bugs, yeylon, zdover |
Target Milestone: | --- | Keywords: | ZStream |
Target Release: | 3.3.3 | ||
Hardware: | Unspecified | ||
OS: | Unspecified | ||
Whiteboard: | infra | ||
Fixed In Version: | org.ovirt.engine-root-3.3.0-51 | Doc Type: | Bug Fix |
Doc Text: |
Previously, jobs that took a long time to complete were removed from the task list in the Administration Portal even if they were in progress. This was caused by the logic used to clean up jobs: jobs that contained at least one step that did not include any asynchronous tasks were deleted. Now, the logic has been revised so that only jobs without steps including asynchronous tasks are deleted.
|
Story Points: | --- |
Clone Of: | Environment: | ||
Last Closed: | 2014-05-27 09:07:36 UTC | Type: | Bug |
Regression: | --- | Mount Type: | --- |
Documentation: | --- | CRM: | |
Verified Versions: | Category: | --- | |
oVirt Team: | Infra | RHEL 7.3 requirements from Atomic Host: | |
Cloudforms Team: | --- | Target Upstream Version: | |
Embargoed: |
Description
Pablo Iranzo Gómez
2014-03-21 11:12:59 UTC
This issue was fixed in 3.4.0 (See Bug #1064227). Need to backport to 3.3.Z. Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. http://rhn.redhat.com/errata/RHBA-2014-0547.html |