Description of problem: There is a misspelling in the Scheduler Optimization Tool Tip within the Cluster Policy configuration UI for a Cluster object. Version-Release number of selected component (if applicable): 3.3.0 How reproducible: 100% Steps to Reproduce: 1. Edit a Cluster 2. Cluster Policy 3. Hover over Scheduler Optimization tooltip Actual results: "shceduling" Expected results: "scheduling" Additional info: The wording on this tooltip is also a little confusing. Let's try to clean this up while fixing the typo
Created attachment 854018 [details] Typo Screenshot
referenced patch has been merged, shouldn't this be in modified?
moving to 3.3.2 since 3.3.1 was built and moved to QE.
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. http://rhn.redhat.com/errata/RHSA-2014-0506.html