Red Hat Satellite engineering is moving the tracking of its product development work on Satellite to Red Hat Jira (issues.redhat.com). If you're a Red Hat customer, please continue to file support cases via the Red Hat customer portal. If you're not, please head to the "Satellite project" in Red Hat Jira and file new tickets here. Individual Bugzilla bugs will be migrated starting at the end of May. If you cannot log in to RH Jira, please consult article #7032570. That failing, please send an e-mail to the RH Jira admins at rh-issues@redhat.com to troubleshoot your issue as a user management inquiry. The email creates a ServiceNow ticket with Red Hat. Individual Bugzilla bugs that are migrated will be moved to status "CLOSED", resolution "MIGRATED", and set with "MigratedToJIRA" in "Keywords". The link to the successor Jira issue will be found under "Links", have a little "two-footprint" icon next to it, and direct you to the "Satellite project" in Red Hat Jira (issue links are of type "https://issues.redhat.com/browse/SAT-XXXX", where "X" is a digit). This same link will be available in a blue banner at the top of the page informing you that that bug has been migrated.
Bug 1548167 - sync task does not ever complete if satellite is interrupted during run
Summary: sync task does not ever complete if satellite is interrupted during run
Keywords:
Status: CLOSED ERRATA
Alias: None
Product: Red Hat Satellite
Classification: Red Hat
Component: Pulp
Version: 6.2.10
Hardware: Unspecified
OS: Unspecified
unspecified
high
Target Milestone: Unspecified
Assignee: satellite6-bugs
QA Contact: jcallaha
URL:
Whiteboard:
Depends On: 1468078
Blocks: 1482208
TreeView+ depends on / blocked
 
Reported: 2018-02-22 21:53 UTC by Mike McCune
Modified: 2024-06-13 20:51 UTC (History)
28 users (show)

Fixed In Version: pulp-2.8.7.20-1
Doc Type: If docs needed, set a value
Doc Text:
Clone Of: 1468078
Environment:
Last Closed: 2018-05-21 20:16:44 UTC
Target Upstream Version:
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Pulp Redmine 2734 0 High CLOSED - CURRENTRELEASE task group never quite finishes if pulp is restarted in the middle of task run 2018-02-23 03:32:36 UTC
Red Hat Product Errata RHBA-2018:1672 0 None None None 2018-05-21 20:17:13 UTC

Comment 1 pulp-infra@redhat.com 2018-02-23 03:32:37 UTC
The Pulp upstream bug status is at CLOSED - CURRENTRELEASE. Updating the external tracker on this bug.

Comment 2 pulp-infra@redhat.com 2018-02-23 03:32:43 UTC
The Pulp upstream bug priority is at High. Updating the external tracker on this bug.

Comment 3 pulp-infra@redhat.com 2018-02-23 04:02:50 UTC
All upstream Pulp bugs are at MODIFIED+. Moving this bug to POST.

Comment 7 jcallaha 2018-05-21 15:17:10 UTC
Verified in Satellite 6.2.15 Snap 3.

1. Created a custom repository, moving through Sat process to get it into an activation key.
2. Subscribed 1k hosts to the activation key (which also provided katello-agent).
3. Each host then installed katello-agent and reported back to satellite.
4. I then switched the repo url to a larger repo with errata.
5. Sync'd the repo and watched dynflow.
6. pkill celery during Actions::Pulp::Repository::RegenerateApplicability
7. Observed that the Regen task is in suspended state.
8. Restarted pulp_workers and pulp_celerybeat

Result: the task automatically resumed and completed successfully.

Comment 10 errata-xmlrpc 2018-05-21 20:16:44 UTC
Since the problem described in this bug report should be
resolved in a recent advisory, it has been closed with a
resolution of ERRATA.

For information on the advisory, and where to find the updated
files, follow the link below.

If the solution does not work for you, open a new bug report.

https://access.redhat.com/errata/RHBA-2018:1672


Note You need to log in before you can comment on or make changes to this bug.