Red Hat Satellite engineering is moving the tracking of its product development work on Satellite to Red Hat Jira (issues.redhat.com). If you're a Red Hat customer, please continue to file support cases via the Red Hat customer portal. If you're not, please head to the "Satellite project" in Red Hat Jira and file new tickets here. Individual Bugzilla bugs will be migrated starting at the end of May. If you cannot log in to RH Jira, please consult article #7032570. That failing, please send an e-mail to the RH Jira admins at rh-issues@redhat.com to troubleshoot your issue as a user management inquiry. The email creates a ServiceNow ticket with Red Hat. Individual Bugzilla bugs that are migrated will be moved to status "CLOSED", resolution "MIGRATED", and set with "MigratedToJIRA" in "Keywords". The link to the successor Jira issue will be found under "Links", have a little "two-footprint" icon next to it, and direct you to the "Satellite project" in Red Hat Jira (issue links are of type "https://issues.redhat.com/browse/SAT-XXXX", where "X" is a digit). This same link will be available in a blue banner at the top of the page informing you that that bug has been migrated.
Bug 1566395 - Sync Plan not working as expected.
Summary: Sync Plan not working as expected.
Keywords:
Status: CLOSED NOTABUG
Alias: None
Product: Red Hat Satellite
Classification: Red Hat
Component: Sync Plans
Version: 6.3.0
Hardware: x86_64
OS: Linux
unspecified
low
Target Milestone: Unspecified
Assignee: satellite6-bugs
QA Contact: Katello QA List
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2018-04-12 08:51 UTC by Sagar Lutade
Modified: 2018-07-17 08:42 UTC (History)
1 user (show)

Fixed In Version:
Doc Type: If docs needed, set a value
Doc Text:
Clone Of:
Environment:
Last Closed: 2018-07-17 08:42:22 UTC
Target Upstream Version:
Embargoed:


Attachments (Terms of Use)

Description Sagar Lutade 2018-04-12 08:51:47 UTC
Description of problem: Sync plan will not show the Start Time on Sync status. 


Version-Release number of selected component (if applicable):

Satellite 6.3

How reproducible:
Yes create a sync plan and sync a product.

Steps to Reproduce:
1.Create sync plan.
2.Assign Product.
3.Verify the Sync Status and the Start Time of the product is never correct.

Expected results:

Expected results must be the Start Time should be correctly updated.

Additional info:

This Bug had been fixed in Satellite 6.2.12
https://bugzilla.redhat.com/show_bug.cgi?id=1466919

Comment 1 Brad Buckingham 2018-04-12 12:55:15 UTC
Sagar,

Do you have an internal reproducer available?

If not, can you attach screenshots to illustrate the behavior you are seeing?


Note You need to log in before you can comment on or make changes to this bug.