Description of problem: When the user cancels a PipelineRun, the UI shows this status as failed not cancelled despite the underlying data saying otherwise. Version-Release number of selected component (if applicable): OpenShift Console 4.4 Pipeline Operator 0.8.x How reproducible: !00% Steps to Reproduce: 1. Create a Pipeline with at least one task 2. Start the Pipeline 3. Stop the Pipeline before it finishes all the tasks Actual results: PipelineRun shows up as failed in the statuses (Pipeline Table (latest run), PipelineRun Table, etc) Expected results: PipelineRun should show up as Cancelled and use the cancelled colour. Additional info:
Gajanan please review this as an extension of your review here: https://issues.redhat.com/browse/ODC-2423
I have validated this bug on the, Build: 4.4.0-0.ci-2020-01-16-043412 Browser: Google Version 78.0.3904.108 Please check the attached screenshot
Created attachment 1653834 [details] Cancelled pipelines are listing down in cancelled pipeline menu
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. https://access.redhat.com/errata/RHBA-2020:0581