+++ This bug was initially created as a clone of Bug #2264348 +++ Description of problem: There is inconsistency in the way the month spec (m) is defined for cephfs snap_schedule and rbd mirror (M) Version-Release number of selected component (if applicable): How reproducible: Steps to Reproduce: 1. 2. 3. Actual results: Expected results: m -> minute M -> month Additional info: with this change, QE will need update cephfs snapshot schedule tests to use 'm' for minute level snapshots and 'M' for monthly snapshots. --- Additional comment from RHEL Program Management on 2024-02-15 11:56:42 IST --- Please specify the severity of this bug. Severity is defined here: https://bugzilla.redhat.com/page.cgi?id=fields.html#bug_severity. --- Additional comment from Milind Changire on 2024-02-16 09:53:29 IST --- MR - https://gitlab.cee.redhat.com/ceph/ceph/-/merge_requests/489 --- Additional comment from Venky Shankar on 2024-02-16 10:50:01 IST --- (In reply to Milind Changire from comment #2) > MR - https://gitlab.cee.redhat.com/ceph/ceph/-/merge_requests/489 Merged. --- Additional comment from on 2024-02-17 10:55:05 IST --- Builds are ready for testing. We need a qa_ack+ in order to attach this BZ to the errata advisory and move to ON_QA. --- Additional comment from errata-xmlrpc on 2024-02-20 20:58:59 IST --- This bug has been added to advisory RHBA-2024:126567 by Thomas Serlin (tserlin) --- Additional comment from errata-xmlrpc on 2024-02-20 20:59:02 IST --- Bug report changed to ON_QA status by Errata System. A QE request has been submitted for advisory RHBA-2024:126567-01 https://errata.engineering.redhat.com/advisory/126567 --- Additional comment from errata-xmlrpc on 2024-02-20 20:59:09 IST --- This bug has been added to advisory RHBA-2024:126567 by Thomas Serlin (tserlin) --- Additional comment from on 2024-03-08 11:19:36 IST --- Test Plan: - Make required changes( 'M' to 'm' for minutely schedule interval) in existing snap schedule automated regression runs and validate test coverage with 'm'. --- Additional comment from on 2024-03-08 11:25:54 IST --- (In reply to sumr from comment #8) > Test Plan: > - Make required changes( 'M' to 'm' for minutely schedule interval) in > existing snap schedule automated regression runs and validate test coverage > with 'm'. Regression test logs with required fix : http://magna002.ceph.redhat.com/cephci-jenkins/cephci-run-N308A3/snap_schedule_retention_vol_subvol_0.log Marking the BZ as VERIFIED as existing snap schedule regression tests works with 'm' for minutely schedule. --- Additional comment from Akash Raj on 2024-03-14 10:41:52 IST --- Hi Venky Please confirm if the doc text for this BZ needs to be added in the release notes. If yes, please provide the doc type and text. Thanks. --- Additional comment from Venky Shankar on 2024-03-14 10:47:10 IST --- (In reply to Akash Raj from comment #10) > Hi Venky > > Please confirm if the doc text for this BZ needs to be added in the release > notes. If yes, please provide the doc type and text. This is a major change and requires doc_text updated. cc Milind - please do the needful.
This BZ was targeted to z5 after the date when it should have been targeted at z6.
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory (Red Hat Ceph Storage 6.1 Bug Fix update), and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. https://access.redhat.com/errata/RHBA-2024:1580