Bug 616405 - Job containing canceled recipes still reports "Completed" as the overall status
Job containing canceled recipes still reports "Completed" as the overall status
Status: CLOSED DUPLICATE of bug 714937
Product: Beaker
Classification: Community
Component: scheduler (Show other bugs)
0.5
All Linux
low Severity medium (vote)
: ---
: ---
Assigned To: beaker-dev-list
tools-bugs
Misc
:
Depends On:
Blocks:
  Show dependency treegraph
 
Reported: 2010-07-20 07:29 EDT by Petr Šplíchal
Modified: 2016-08-08 01:00 EDT (History)
8 users (show)

See Also:
Fixed In Version:
Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of:
Environment:
Last Closed: 2016-08-08 01:00:07 EDT
Type: ---
Regression: ---
Mount Type: ---
Documentation: ---
CRM:
Verified Versions:
Category: ---
oVirt Team: ---
RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: ---


Attachments (Terms of Use)

  None (edit)
Description Petr Šplíchal 2010-07-20 07:29:47 EDT
Description of problem:

I've canceled two recipes (out of four) in TJ#8073. The other two
recipes were completed at that time. The overall status now says:
"Completed". I believe "Canceled" would be more appropriate for
this situation.

Version-Release number of selected component (if applicable):
0.5.49

https://beaker.engineering.redhat.com/jobs/8073
Comment 2 Nick Coghlan 2012-10-17 00:36:47 EDT
Bulk reassignment of issues as Bill has moved to another team.
Comment 5 Dan Callaghan 2016-08-08 01:00:07 EDT
This was fixed in Beaker 21.0 for bug 714937. A job with some recipes Completed and some Cancelled will now have an overall status of Cancelled.

*** This bug has been marked as a duplicate of bug 714937 ***

Note You need to log in before you can comment on or make changes to this bug.