Description of problem: I've canceled two recipes (out of four) in TJ#8073. The other two recipes were completed at that time. The overall status now says: "Completed". I believe "Canceled" would be more appropriate for this situation. Version-Release number of selected component (if applicable): 0.5.49 https://beaker.engineering.redhat.com/jobs/8073
Bulk reassignment of issues as Bill has moved to another team.
This was fixed in Beaker 21.0 for bug 714937. A job with some recipes Completed and some Cancelled will now have an overall status of Cancelled. *** This bug has been marked as a duplicate of bug 714937 ***