Note: This bug is displayed in read-only format because the product is no longer active in Red Hat Bugzilla.

Bug 616405

Summary: Job containing canceled recipes still reports "Completed" as the overall status
Product: [Retired] Beaker Reporter: Petr Šplíchal <psplicha>
Component: schedulerAssignee: beaker-dev-list
Status: CLOSED DUPLICATE QA Contact: tools-bugs <tools-bugs>
Severity: medium Docs Contact:
Priority: low    
Version: 0.5CC: bpeck, dcallagh, ebaak, jingwang, mcsontos, ohudlick, rjoost, tools-bugs
Target Milestone: ---   
Target Release: ---   
Hardware: All   
OS: Linux   
Whiteboard: Misc
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2016-08-08 05:00:07 UTC Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Petr Šplíchal 2010-07-20 11:29:47 UTC
Description of problem:

I've canceled two recipes (out of four) in TJ#8073. The other two
recipes were completed at that time. The overall status now says:
"Completed". I believe "Canceled" would be more appropriate for
this situation.

Version-Release number of selected component (if applicable):
0.5.49

https://beaker.engineering.redhat.com/jobs/8073

Comment 2 Nick Coghlan 2012-10-17 04:36:47 UTC
Bulk reassignment of issues as Bill has moved to another team.

Comment 5 Dan Callaghan 2016-08-08 05:00:07 UTC
This was fixed in Beaker 21.0 for bug 714937. A job with some recipes Completed and some Cancelled will now have an overall status of Cancelled.

*** This bug has been marked as a duplicate of bug 714937 ***